Adams Street Pavement Rehabilitation Project

The work to be done in general consists of mobilization, traffic control, water pollution control program, potholing, hot mix asphalt (HMA), cold planing, pulverization and grading, quicklime/cement soil treatment, removal and replacemnet of concrete curb gutter, sidewalk and curb ramps, lowering and adjusting utility covers to finish grade, removal and replacement of striping and pavement markings, and all other work shown on the Plans and a specified in these Special Provisions.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum#1 936.6 KB
Addendum01_BidSchedule 35.9 KB
Addendum 2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
AdamsStreet__Addendum02 71.3 KB
Addendum02__BidSchedule 36.1 KB