Washington Avenue Rehabilitation Project Phase 2
The work to be done under these specifications includes but is not limited to: traffic control, environmental protections, clearing and grubbing, restore City survey monuments, adjustment of valve boxes and utility boxes, manhole frames, and covers, protection and potholing of underground utility services (e.g. gas, water sewer, storm), concrete curbs and gutters, sidewalk, curb ramps, valley gutters, cold milling asphalt pavement, wedge grinding asphalt pavement, removal and disposal of pavement surface and base, subgrade preparation, proof rolling including over-excavation, roadway base grading and compaction, hot mix asphalt paving, curb paint, pavement markings, striping, and markers as specified. Roadway work includes 2,484 square yards of pavement reconstruction and 216 square yards of pavement milling and overlay along Washington Avenue and its cross streets.
Status
Bidding Closed
Prebid Date11/18/21 2:00pm
Bid Date12/7/21 2:00pm
Company & Contacts
City of Albany
James Cirelli, JCirelli@albanyca.org
510-559-4594
Location
Washington Ave in Albany, Ca
A bidder’s conference will be held on THURSDAY, NOVEMBER 18TH, 2021 @ 2:00 PM., at the City Public Works Department: 540 Cleveland Avenue, Albany, California to acquaint all prospective bidders with the Contract Documents and the Worksite. The bidders’ conference is not mandatory.
BIDS DUE BY: TUESDAY, DECEMBER 7TH, 2021 @ 2:00 PM
ENGINEER’S ESTIMATE: $540,000