Sidewalk Rehablilitation Program Phase 7
Repair of sidewalks at 47 locations throughout the City including, but not limited to, removal and replacement of concrete sidewalk, curb, gutter, and asphalt roadway, as-needed tree maintenance work such as root shaving and root pruning, and installation of two curb and gutter passthrough bulbouts.
    
    
    
    
    
    
    
            
                                                Plans
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | ||
| C23-09 Phase 7 Plans pg 01-35 | 27.5 MB | ||
| C23-09 Phase 7 Plans pg 36-71 | 31.9 MB | 

