Sidewalk Rehabilitation Program Phase 9
Repair of sidewalks at 35 locations throughout the City including, but not limited to, removal and replacement of concrete sidewalk, concrete driveway approach, and as-needed tree maintenance work such as root shaving and root pruning
    
    
    
    
    
    
    
            
                                                Plans
                 (click to expand/collapse)
 (click to expand/collapse)
            
             (click to expand/collapse)
 (click to expand/collapse)
            | Name | Size | ||
| C24-24 Phase 9 Plans | 20.5 MB | 

