Sidewalk Rehabilitation Program Phase 10
Description: Repair of sidewalks at 36 locations throughout the City including, but not limited to, removal and replacement of concrete sidewalk, concrete driveway approach, concrete curb and gutter, and as-needed tree maintenance work such as root shaving and root pruning.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| C24-24 Phase 10 Contract-Specs-App | 9.2 MB |

